GOGINAURI HPP (In progress)

- Installed capacity: 4.72 MW
- Annual output: 21.7 GWh
- Number of Pelton turbines: 1 unit
- Discharge per 1 unit: 2.4 m^3/s
- Water intake: 945 m.a.s.l.*
- Powerhouse: 699 m.a.s.l.
- Pressure: 246 m
- Penstock diameter: 1200 mm
- Penstock length: 3130 m
OQROPILAURI HPP

- Installed capacity: 4.36 MW
- Annual output: 22.36 GWh
- Number of Pelton turbines: 2 units
- Discharge per 1 unit: 3.5 m^3/s
- Water intake 1: 492 m.a.s.l.
- Water intake 2: 492 m.a.s.l.
- Powerhouse: 415 m.a.s.l.
- Pressure: 77 m
- Penstock diameter 1: 1300 mm/length 1800 m
- Penstock diameter 2: 1600 mm/length 2400 m
OQROPILAURI-3 HPP

- Installed capacity: 3.8 MW
- Annual output: 18.4 GWh
- Number of Pelton turbines: 2 units
- Discharge per 1 unit: 2 m^3/s
- Water intake: 725 m.a.s.l.
- Powerhouse: 495 m.a.s.l.
- Pressure: 230 m
- Channel length: 3940 m
- Penstock diameter: 1000 mm
- Penstock length: 300 m
DGVANI HPP

- Installed capacity: 5.64 MW
- Annual output: 29.77 GWh
- Number of Pelton turbines: 2 units
- Discharge per 1 unit: 2.15 m^3/s
- Water intake: 680 m.a.s.l.
- Powerhouse: 520 m.a.s.l.
- Pressure: 151.8 m
- Penstock diameter: 1600 mm
- Penstock length: 4570 m